Powering Sustainable Transportation
Provide your municipality with a sustainable solution for powering the future of transportation.
Powering Your Community
Accelerate Your Municipality's Transition to Green Transporation
ChargerCrew is dedicated to helping municipalities achieve their sustainability goals by providing comprehensive EV charging infrastructure solutions. With our expertise, we make it easy for your municipality to embrace greener transportation and create a more sustainable future. From installation to activation, we handle every aspect of the process for you.

EV Charging Solutions for Municipalities
ChargerCrew offers comprehensive services tailored to the needs of cities and municipalities.
Reduce Your Emissions
Transform your city's public transportation fleet to electric.
Increase Tourism
Attract electric vehicle owners travelling and charging in the area, who may spend money on services and businesses in your local economy.
Future-Proof
Municipalities can prepare for the future by investing in EV charging infrastructure.
Municipalities We've Installed For






Charge Your City
Level 2 and Level 3 EV charging solutions

level 2 ac charger
ChargePoint® CP6000
Power up your municipality with the Level 2 CP6000 charger. Allow students, faculty, and teachers to charge up while on campus with this Level 2 charging solution.
- Utilizes the universal SAE J1772™ Connector
- Up to 19 kW (80 A) and 12 kW (50 A), adjustable from 3.7 to 22 kW per port of power
- Is UL and cUL listed; complies with UL 2594, UL 2231 and NEC Article 625
What We Do:
Station Design and Configuration
Installation and Delivery
Maintenance and Ongoing Support

level 3 dc charger
ChargePoint® CPE250
Power up your municipality with the Level 3 Express250 Fast Charger. This is a faster EV charging solution for campuses with shorter dwelling times, and looking for a stronger and more powerful charge.
- Utilizes CCS1, CCS2, CHAdeMO connector types
- 62.5 kW of output power, 125 kW if paired
- Is UL and cUL listed; complies with UL 2594, UL 2231 and NEC Article 625
Max power
Up to 80A
What We Do:
Station Design and Configuration
Installation and Delivery
Maintenance and Ongoing Support